| Term | Explanation |
|---|---|
| CIPP liners | flexible, resin-impregnated tube inserted into a damaged pipe, where it cures to form a new pipe within the existing pipe. |
| CIPP lining | A rehabilitation method using pipe liners. CIPP is the internationally used abbreviation for “Cured-in-Place Pipe”. |
| Trenchless rehabilitation | Rehabilitation using a closed construction method, without excavating the pipeline. Also referred to as “trenchless technology”. |
| LED light curing | Curing the liner resin with LED light rather than heat (hot water or steam) or UV gas-discharge lamps. |
| Blue light (450 nm) | The wavelength range of Bluelight LEDs, which gives the rehabilitation system its name. |
| Vinyl ester resin (VE) | Used by Bluelight in the form of the styrene-free AP450 variant. |
| Polyester resin (UP) | Used by Bluelight in the form of the styrene-containing PB450 resin for the GF-Liner. |
| Styrene-free | Used by Bluelight in the form of the styrene-containing PB450 resin for the GF-Liner. |
| Resin carrier | The liner’s carrier material, which absorbs the resin. Bluelight uses both synthetic fibres and glass fibres. |
| PAA F-Liner | A flexible Bluelight liner with a synthetic-fibre carrier for DN70–DN400. It can negotiate bends and accommodate changes in nominal diameter. It is installed by inversion. |
| PAA GF-Liner | A Bluelight liner with a glass-fibre carrier (GRP) for DN150–DN600 and egg-shaped sections. It is pulled into place. |
| Inversion method | An installation method in which the liner is turned inside out into the pipeline using air or water pressure. The Bluelight process uses compressed air only. |
| Pull-in method | An installation method in which the liner is pulled into the pipeline using a winch and then inflated with compressed air. |
| Support tube / calibration tube | An inner hose that presses the liner against the pipe wall during curing. In the Bluelight system, it transmits light and is reusable. |
| Open-end rehabilitation | Rehabilitation of a pipeline that does not terminate in a manhole at one end, for example at an inspection opening or at a branch connection without a manhole. |